Advanced Composite Engineering 75 Colbourne Avenue Nelson Park Industrial Estate, Northumberland, NE23 1WD
Advanced Composite Engineering, Colbourne Avenue - Solar Panels is a 0.22 MW solar farm project in North East. The applicant or operator on record is Advanced Composite Engineering. Planning permission has been granted as of February 2023 and it is awaiting construction. The deteβ¦
Consented / Approved
Project stageConsented
PlanningDec 2022 (completed)
ConsentedFeb 2023 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2023-02-09.
Registered planning capacity; not measured generation.
Advanced Composite Engineering, Colbourne Avenue - Solar Panels is a 0.22 MW solar farm project in North East. The applicant or operator on record is Advanced Composite Engineering. Planning permission has been granted as of February 2023 and it is awaiting construction. The determining authority is Northumberland, reference 22/04610/SOLAR.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.220 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Advanced Composite Engineering
Owner / operator
Advanced Composite Engineering
Year consented
2023
Location
Advanced Composite Engineering 75 Colbourne Avenue Nelson Park Industrial Estate, Northumberland, NE23 1WD