πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Adrian Scripps, Moat Farm - Solar Panels

Adrian Scripps Limited, Moat Farm, Five Oak Green, Tonbridge, Kent, TN12 6RR

Adrian Scripps, Moat Farm - Solar Panels is a 0.29 MW solar farm project in South East. The applicant or operator on record is Adrian Scripps Limited. Planning permission has been granted as of November 2025 and it is awaiting construction. The determining authority is Tunbridge …

Consented / Approved
Project stageConsented
  1. PlanningSep 2025 (completed)
  2. ConsentedNov 2025 (current stage)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Permission Granted.

Official register: July 2026

Recorded status: Planning Permission Granted. Source record updated 2025-12-02.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.290 MW
Registered Capacity

πŸ“‹ Project Overview

Adrian Scripps, Moat Farm - Solar Panels is a 0.29 MW solar farm project in South East. The applicant or operator on record is Adrian Scripps Limited. Planning permission has been granted as of November 2025 and it is awaiting construction. The determining authority is Tunbridge Wells, reference 25/02230/PN14J.

Site Schematic

SUBSTATION ? ha Β· 0.29 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.290 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperAdrian Scripps Limited
Owner / operatorAdrian Scripps Limited
Year consented2025
LocationAdrian Scripps Limited, Moat Farm, Five Oak Green, Tonbridge, Kent, TN12 6RR
RegionSouth East
Coordinates51.1883045Β°N, 0.3543266Β°E

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof

πŸ“… Project Timeline

2025-09-22
2025-11-17