Solar Farm

Abp Border Control Post Building, Queens Road - Solar Photovoltaic Panel

Abp Border Control Post Building, Queens Road, Immingham, Grimsby, Lincolnshire, DN40 2QW

Abp Border Control Post Building, Queens Road - Solar Photovoltaic Panel is a 0.43 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Associated British Ports. Planning permission has been granted as of October 2023 and it is awaiting constructi…

Consented / Approved
Official register: July 2026

Recorded status: Planning Permission Granted. Source record updated 2023-10-16.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.430 MW
Registered Capacity

πŸ“‹ Project Overview

Abp Border Control Post Building, Queens Road - Solar Photovoltaic Panel is a 0.43 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Associated British Ports. Planning permission has been granted as of October 2023 and it is awaiting construction. The determining authority is North East Lincolnshire, reference DM/0823/23/PNSOL.

Site Schematic

SUBSTATION ? ha Β· 0.43 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.430 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperAssociated British Ports
Owner / operatorAssociated British Ports
Year consented2023
LocationAbp Border Control Post Building, Queens Road, Immingham, Grimsby, Lincolnshire, DN40 2QW
RegionYorkshire and Humber
Coordinates53.617789Β°N, 0.1786752Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Storage Co-location REPD Ref ID
CfD Capacity (MW)
Turbine Capacity (MW)
No. of Turbines
Height of Turbines (m)
Mounting Type for SolarRoof
Are they re-applying (New REPD Ref)
Are they re-applying (Old REPD Ref)
Solar Site Area (sqm)

πŸ“… Project Timeline

2023-08-17
2023-10-09