π Project Overview
Abbotsinch Road - Micro Energy Storage Facility is a 0.2 MW battery storage project in Scotland. The applicant or operator on record is AMP Clean Energy. Planning permission has been granted as of May 2025 and it is awaiting construction. The determining authority is Falkirk, reference P/25/0120/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 0 MW |
| Battery chemistry | Stand-alone Storage |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | AMP Clean Energy |
| Owner / operator | AMP Clean Energy |
| Year consented | 2025 |
| Location | W/O Units 7-11, Abbotsinch Road, Grangemouth, Falkirk, FK3 9HG |
| Region | Scotland |
| Coordinates | 56.0120859Β°N, 3.7087579Β°W |