Abbotshaugh, New Deer, Turriff, Aberdeenshire, AB53 6YB
Abbotshaugh Battery Storage is a 500 MW battery storage project in Scotland. The applicant or operator on record is Island Green Power (IGP Solar 25 Limited). The scheme is currently in the planning system, submitted May 2025. The determining authority is Scottish Government (S36β¦
In Planning
Official register: July 2026
Recorded status: Planning Application Submitted. Source record updated 2025-06-27.
Registered planning capacity; not measured generation.
Abbotshaugh Battery Storage is a 500 MW battery storage project in Scotland. The applicant or operator on record is Island Green Power (IGP Solar 25 Limited). The scheme is currently in the planning system, submitted May 2025. The determining authority is Scottish Government (S36), reference ECU00005224.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
500.000 MW
Battery chemistry
Stand-alone Storage
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Island Green Power (IGP Solar 25 Limited)
Owner / operator
Island Green Power (IGP Solar 25 Limited)
Location
Abbotshaugh, New Deer, Turriff, Aberdeenshire, AB53 6YB