Project facts
| Status | Operating |
|---|---|
| Developer / operator | Yondr |
| Region | Berkshire |
| Country | England |
| Published rating | 100 MW |
| Rating definition | Planned campus capacity |
| Connection / route | Slough |
| Delivery target | Not verified in this profile |
Operating phases, with wider campus development.
Electricity demand and supply
| IT capacity | Not published |
|---|---|
| Grid connection capacity | Not published |
| Apparent power reservation / substation rating | Not published |
| Measured average electricity demand | Not published |
| Published annual electricity consumption | Not published |
| Power usage effectiveness (PUE) | Not published |
Where its electricity comes from
Grid supply. Site-specific renewable contracts, private-wire supply and annual consumption have not been confirmed in the reviewed source.
Cooling, water and backup power
Cooling and water-use figures have not been independently confirmed.
Backup capacity and fuel are not quantified in this profile.
Rated capacity is not present consumption. Renewable procurement claims describe contracts or certificates unless hourly matching and physical supply are evidenced. No live site meter is connected to this page.
Project location
The map distinguishes published or mapped site points from approximate location and connection areas. Dashed circles are context areas, not development boundaries. Follow the location sources for site plans.
Loading OpenStreetMapβ¦
- Slough campus area; exact campus point unconfirmed Approximate area; exact site not confirmed Open larger map Location source Coordinate source 51.508, -0.588 Β· WGS84
Markers identify sites, published points or labelled connection areas. Markers are not site boundaries or entrances. EGL2βs additional outlines and route layers are explicitly identified in the developerβs map data.
Sources and review date
- Yondr project information
Reviewed 2026-10-08
How Octary distinguishes proposals, published ratings and live measurements