Operating

The operator publishes 12 MW of critical IT load and a 60 MVA onsite substation. The redundant supply system supports resilience; its summed ratings must not be treated as a continuous electricity requirement.

Sources reviewed 2026-10-08 Β· NTT

Project facts

StatusOperating
Developer / operatorNTT
RegionHertfordshire
CountryEngland
Published rating12 MW
Rating definitionIT capacity
Connection / routeDual 11 kV connections; onsite 60 MVA substation
Delivery targetNot verified in this profile

Electricity demand and supply

IT capacity12 MW
Grid connection capacityNot published
Apparent power reservation / substation rating60 MVA
Measured average electricity demandNot published
Published annual electricity consumptionNot published
Power usage effectiveness (PUE)Not published

Where its electricity comes from

Grid supply. Site-specific renewable contracts, private-wire supply and annual consumption have not been confirmed in the reviewed source.

Cooling, water and backup power

NTT describes centrally managed cooling and humidity control with at least N+1 redundancy. Water use and measured PUE are not disclosed here.

Backup capacity and fuel are not quantified in this profile.

Rated capacity is not present consumption. Renewable procurement claims describe contracts or certificates unless hourly matching and physical supply are evidenced. No live site meter is connected to this page.

Project location

Published facility or mapped building location. A location point is not a site boundary or a verified visitor entrance.

Loading OpenStreetMap…

Markers identify sites, published points or labelled connection areas. Markers are not site boundaries or entrances. EGL2’s additional outlines and route layers are explicitly identified in the developer’s map data.

Sources and review date

  1. NTT project information
    Reviewed 2026-10-08

How Octary distinguishes proposals, published ratings and live measurements

Report a correction with a source

GRID CONTEXT

Great Britain electricity now

Explore the grid β†’
Loading the latest published grid interval…

National figures from the Carbon Intensity API. These do not measure an individual project’s output, cable flow or data-centre electricity use.