Data centres · West Lothian

Freeport West Lothian Data Centre Campus

In planning

The developer’s September 2026 statement identifies a 250 MW proposed West Lothian campus. Consultation material also describes onsite battery storage. No independently verified battery energy capacity or annual electricity consumption is available in this profile.

Sources reviewed 2026-10-08 · Apatura

Project facts

StatusIn planning
Developer / operatorApatura
RegionWest Lothian
CountryScotland
Published rating250 MW
Rating definitionProposed campus capacity
Connection / routeWest Lothian
Delivery targetNot verified in this profile

Electricity demand and supply

IT capacityNot published
Grid connection capacityNot published
Apparent power reservation / substation ratingNot published
Measured average electricity demandNot published
Published annual electricity consumptionNot published
Power usage effectiveness (PUE)Not published

Where its electricity comes from

Grid supply. Site-specific renewable contracts, private-wire supply and annual consumption have not been confirmed in the reviewed source.

Cooling, water and backup power

Cooling and water-use figures have not been independently confirmed.

Backup capacity and fuel are not quantified in this profile.

Rated capacity is not present consumption. Renewable procurement claims describe contracts or certificates unless hourly matching and physical supply are evidenced. No live site meter is connected to this page.

Project location

This point is published in the developer’s consultation map. It identifies the project location, not a surveyed boundary or a public entrance.

Loading OpenStreetMap…

  • Freeport West Lothian Data Centre Campus — developer map point Developer-published location Open larger map Location source 55.85444, -3.59278 · WGS84

Markers identify sites, published points or labelled connection areas. Markers are not site boundaries or entrances. EGL2’s additional outlines and route layers are explicitly identified in the developer’s map data.

Sources and review date

  1. September 2026 capacity and proposal status
    Reviewed 2026-10-08
  2. Freeport campus and BESS
    Reviewed 2026-10-08

How Octary distinguishes proposals, published ratings and live measurements

Report a correction with a source

GRID CONTEXT

Great Britain electricity now

Explore the grid →
Loading the latest published grid interval…

National figures from the Carbon Intensity API. These do not measure an individual project’s output, cable flow or data-centre electricity use.