πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
WIND Β· OPERATIONAL

Deeping

Deeping is a 16 MW onshore wind farm in East Midlands England, operated by EDF Energy. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • East Midlands
  • England
Project stageOperating
  1. PlanningFeb 2002 (completed)
  2. ConsentedMay 2003 (completed)
  3. Construction (completed)
  4. OperatingAug 2006 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
16 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
EDF Energy
Region
East Midlands
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
PE11 3DD
Coordinates
52.7326, -0.2257

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Deeping compares

257th of 488largest wind farms in the UK register
10th of 34in East Midlands
0.05%of listed UK wind farms capacity
β‰ˆ 36 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 16 MW station would generate roughly 36 GWh of electricity in a year, similar to the annual use of about 13,500 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in East Midlands All run by EDF Energy

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Deeping St Nicholas Wind Farm
Developer / operator
Wind Prospect Developments
Planning authority
South Holland
Planning reference
H03-0161-02
Application submitted
11 February 2002
Permission granted
18 May 2003
Began operating
1 August 2006
Capacity in planning record
16.4 MW
Address
Vine House Farm Worths Farm and Porters Farm, Deeping St Nicholas, Lincolnshire
REPD reference
3609

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.