Offshore Wind

Hornsea Three

160–200 km off the Yorkshire/Lincolnshire coast

Hornsea Three will be one of the largest offshore wind farms in the world when built. Consented in 2020, Ørsted temporarily withdrew from the AR5 CfD auction citing rising costs but re-engaged with AR6. With 231 planned turbines generating up to 2,852 MW, the project faces signi…

Consented / Approved Β· Target 2027
2,955 MW
Installed Capacity
231
Turbines
3,200k
Homes Powered
10,500 GWh
Est. Annual Output
2027
Target Date

πŸ“‹ Project Overview

Hornsea Three will be one of the largest offshore wind farms in the world when built. Consented in 2020, Ørsted temporarily withdrew from the AR5 CfD auction citing rising costs but re-engaged with AR6. With 231 planned turbines generating up to 2,852 MW, the project faces significant grid connection challenges at this distance from shore, making HVDC export cables likely.

Site Schematic

β—„ SHORE (~160 km) NORTH SEA / NORTH SEA Turbine (Siemens Gamesa SG 14-222 DD (planned)) Export cable

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

⚑ Key Facts

β†’ One of the largest consented offshore wind projects in the world
β†’ Ørsted withdrew from AR5 2023 auction over rising inflation costs
β†’ Distance from shore may require HVDC export cables (first for UK offshore)
β†’ Would power over 3 million UK homes annually
β†’ Grid connection substation at Bicker Fen required for project to proceed
β†’ Turbine selection not yet finalised β€” SG 14-222 or successor likely

πŸ”§ Technical Specifications

Capacity (MW)2,955 MW
No. of turbines/units231
Turbine / unit modelSiemens Gamesa SG 14-222 DD (planned)
Unit capacity13 MW each
Rotor diameter222 m
Hub height150 m
Foundation typeMonopile (XL) or Jacket
Water depth30–50 m
Distance from shore160 km
Site area695 kmΒ²
Annual output10,500 GWh/year
Homes powered3,200,000 homes

πŸ”Œ Grid Connection & Infrastructure

Grid connection pointBicker Fen, Lincolnshire (new 400 kV substation)
Voltage400 kV
Export cableHVDC planned β€” distance requires direct current transmission
CfD heldNo (merchant / PPA)

🏒 Development & Ownership

DeveloperØrsted
Owner / operatorØrsted
Year consented2020
Construction started2026
Commissioned / target2027
Capex estimate~Β£8–10 billion estimated
Location160–200 km off the Yorkshire/Lincolnshire coast
RegionNorth Sea
Coordinates54Β°N, 2.4Β°E

πŸ“… Project Timeline

2017
Application submitted to Planning Inspectorate
Dec 2020
Development Consent Order granted
2023
Ørsted withdraws from CfD AR5 citing cost pressures
2024
Re-engagement with AR6 and revised project timeline
2026
Construction targeted start (subject to FID)

🌿 Environmental & Planning

Largest EIA ever submitted for a UK offshore wind project at time of application. Key concerns: impact on North Sea bird flight paths (especially terns and gannets), cumulative impact alongside H1/H2, and shipping route conflicts. HRA screening conducted for nearby Humber SPA.