πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

Data centre directory / Project Dorothy 2

Project Dorothy 2

Soluna Computing Β· Amarillo Β· Texas

This is a source record, not confirmation of a currently operating facility. Other records may describe the same facility or campus.

Facility information

Operator
Soluna Computing
Country
United States
State / region
Texas
Region basis
Source state / region field
City / market
Amarillo
Address
Not supplied
County
Briscoe County
Established year
Not supplied
Current status
Not verified
Dataset
US facility atlas
Source date
2026-06-25T08:28:01.075806+00:00

Location

Source-geocoded location; accuracy is not independently verified. Market is used for the city/market filter.

Source coordinates: 34.394669906691, -101.31854381012. Treat the marker as approximate.

Open location in OpenStreetMap

Energy and environmental figures

Figures below come from the supplied US atlas snapshot. Modelled values are estimates, not measured consumption or confirmed grid connections. Confidence labels are the source’s own labels and have not been independently verified by Octary.

MetricSource valueBasis
IT power48 MWSource confidence: announced; basis: description
Annual IT electricity420480 MWh/yearDerived / estimated
Power usage effectiveness1.22 Source assumption / estimate
Annual facility electricity512986 MWh/yearDerived / estimated
Annual water consumption126.14 million US gallons/yearSource confidence: proxy
Water usage effectiveness0.3 L/kWhSource assumption / estimate
Water stress score2.5 Area-level source model
Water stress categoryMedium-High Area-level source model
Grid subregionERCT Source assignment
Grid carbon intensity880 lb COβ‚‚/MWhRegional factor, not facility measurement
Annual COβ‚‚e204764 tons/year (source unit)Derived / estimated; ton definition not supplied

Source and original fields

facilities.json. Imported snapshot: 2 November 2026. This date describes ingestion, not verification. No missing capacity, ownership or planning information has been inferred.

View all original source fields
{
    "id": "site:usa/texas/amarillo/project-dorothy-2",
    "name": "Project Dorothy 2",
    "operator": "Soluna Computing",
    "lat": 34.39466990669066,
    "lon": -101.3185438101213,
    "state": "Texas",
    "county": "Briscoe County",
    "countyFips": "48045",
    "footprintSqft": null,
    "footprintSource": null,
    "geometryType": "building",
    "establishedYear": null,
    "source": "curated",
    "market": "Amarillo",
    "metrics": {
        "itPowerMw": 48,
        "itPowerConfidence": "announced",
        "annualItMwh": 420480,
        "pue": 1.22,
        "facilityMwh": 512986,
        "waterConsumptionMgy": 126.14,
        "waterConfidence": "proxy",
        "wueLPerKwh": 0.3,
        "waterStressScore": 2.5,
        "waterStressLabel": "Medium-High",
        "gridSubregion": "ERCT",
        "gridCo2LbPerMwh": 880,
        "annualCo2eTons": 204764,
        "bciReliable": false,
        "powerSource": "description",
        "bci": null,
        "bciLabel": "Insufficient size data",
        "bciComponents": {
            "water": 0.5,
            "electric": null,
            "carbon": 0.704
        }
    }
}

Browse this operator’s records