πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

Data centre directory / Big Digital Energy Midland

Big Digital Energy Midland

Big Digital Energy, Inc. Β· Pittsburgh Β· Pennsylvania

This is a source record, not confirmation of a currently operating facility. Other records may describe the same facility or campus.

Facility information

Operator
Big Digital Energy, Inc.
Country
United States
State / region
Pennsylvania
Region basis
Source state / region field
City / market
Pittsburgh
Address
Not supplied
County
Beaver County
Established year
Not supplied
Current status
Not verified
Dataset
US facility atlas
Source date
2026-06-25T08:28:01.075806+00:00

Location

Source-geocoded location; accuracy is not independently verified. Market is used for the city/market filter.

Source coordinates: 40.632138563721, -80.451990893373. Treat the marker as approximate.

Open location in OpenStreetMap

Energy and environmental figures

Figures below come from the supplied US atlas snapshot. Modelled values are estimates, not measured consumption or confirmed grid connections. Confidence labels are the source’s own labels and have not been independently verified by Octary.

MetricSource valueBasis
IT power120 MWSource confidence: announced; basis: description
Annual IT electricity1051200 MWh/yearDerived / estimated
Power usage effectiveness1.22 Source assumption / estimate
Annual facility electricity1282464 MWh/yearDerived / estimated
Annual water consumption315.36 million US gallons/yearSource confidence: proxy
Water usage effectiveness0.3 L/kWhSource assumption / estimate
Water stress score2.5 Area-level source model
Water stress categoryMedium-High Area-level source model
Grid subregionRFCW Source assignment
Grid carbon intensity1150 lb COβ‚‚/MWhRegional factor, not facility measurement
Annual COβ‚‚e668974 tons/year (source unit)Derived / estimated; ton definition not supplied

Source and original fields

facilities.json. Imported snapshot: 2 November 2026. This date describes ingestion, not verification. No missing capacity, ownership or planning information has been inferred.

View all original source fields
{
    "id": "site:usa/pennsylvania/pittsburgh/mawson-midland",
    "name": "Big Digital Energy Midland",
    "operator": "Big Digital Energy, Inc.",
    "lat": 40.63213856372092,
    "lon": -80.45199089337257,
    "state": "Pennsylvania",
    "county": "Beaver County",
    "countyFips": "42007",
    "footprintSqft": null,
    "footprintSource": null,
    "geometryType": "building",
    "establishedYear": null,
    "source": "curated",
    "market": "Pittsburgh",
    "metrics": {
        "itPowerMw": 120,
        "itPowerConfidence": "announced",
        "annualItMwh": 1051200,
        "pue": 1.22,
        "facilityMwh": 1282464,
        "waterConsumptionMgy": 315.36,
        "waterConfidence": "proxy",
        "wueLPerKwh": 0.3,
        "waterStressScore": 2.5,
        "waterStressLabel": "Medium-High",
        "gridSubregion": "RFCW",
        "gridCo2LbPerMwh": 1150,
        "annualCo2eTons": 668974,
        "bciReliable": false,
        "powerSource": "description",
        "bci": null,
        "bciLabel": "Insufficient size data",
        "bciComponents": {
            "water": 0.5,
            "electric": null,
            "carbon": 0.92
        }
    }
}

Browse this operator’s records