Offshore Wind

Seagreen Wind Energy

27 km off the Angus coast in the Outer Firth of Forth

Seagreen is Scotland's largest offshore wind farm and one of the deepest fixed-foundation wind farms in the world. At up to 55 metres depth, some of the 114 turbines required jacket foundations rather than the simpler monopile design. The 10 MW Siemens Gamesa direct-drive turbine…

Operational Β· Since 2023
1,075 MW
Installed Capacity
114
Turbines
1,600k
Homes Powered
5,000 GWh
Est. Annual Output
2023
Commissioned

πŸ“‹ Project Overview

Seagreen is Scotland's largest offshore wind farm and one of the deepest fixed-foundation wind farms in the world. At up to 55 metres depth, some of the 114 turbines required jacket foundations rather than the simpler monopile design. The 10 MW Siemens Gamesa direct-drive turbines have a rotor diameter of 193 metres β€” one of the largest rotors commercially deployed.

Site Schematic

β—„ SHORE (~27 km) NORTH SEA / SCOTLAND Turbine (Siemens Gamesa SG 10.0-193 DD) Export cable

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

⚑ Key Facts

β†’ Scotland's largest offshore wind farm
β†’ One of the world's deepest fixed-foundation offshore wind farms (up to 55 m)
β†’ Uses mixed foundation types: monopiles (shallower) and jackets (deeper)
β†’ TotalEnergies' first major equity stake in a UK offshore wind project
β†’ Visible from St Andrews, the Angus coast and Dundee on clear days
β†’ 193 m rotor diameter β€” among the largest deployed at time of construction

πŸ”§ Technical Specifications

Capacity (MW)1,075 MW
No. of turbines/units114
Turbine / unit modelSiemens Gamesa SG 10.0-193 DD
Unit capacity10 MW each
Rotor diameter193 m
Hub height120 m
Foundation typeMonopile and Jacket (mixed)
Water depth25–55 m
Distance from shore27 km
Site area330 kmΒ²
Annual output5,000 GWh/year
Homes powered1,600,000 homes

πŸ”Œ Grid Connection & Infrastructure

Grid connection pointTealing substation, Angus
Voltage400 kV
Export cableAC 132 kV submarine cables
CfD heldYes β€”

🏒 Development & Ownership

DeveloperSSE Renewables / TotalEnergies
Owner / operatorSSE Renewables (51%), TotalEnergies (49%)
Year consented2017
Construction started2021
Commissioned / target2023
Capex estimate~Β£3 billion
Location27 km off the Angus coast in the Outer Firth of Forth
RegionScotland
Coordinates56.55Β°N, 1.95Β°W

πŸ“… Project Timeline

2014
Planning consent from Scottish Ministers
2020
Construction commences β€” first monopile installed
2022
First power generated
Jan 2023
Full commercial operation declared

🌿 Environmental & Planning

The Outer Firth of Forth is adjacent to the Firth of Forth SPA, a protected area for seabirds including gannets, terns and puffins. Detailed ornithological surveys and avoidance modelling were used to inform the layout. A collision risk management plan is in place and operational monitoring is ongoing.