Conventional Hydro

Invervar Hydro

Invervar, Glen Lyon Perth and Kinross, Tayside

Invervar Hydro is a 1.2 MW conventional hydro project in Scotland. The applicant or operator on record is Green Highland Renewables. The scheme is currently in the planning system, submitted August 2007. The determining authority is Perth and Kinross, reference 07/00004/HYDRO.…

Revised
Project stageSuperseded by a new application
  1. PlanningAug 2007 (completed)
  2. Superseded by a new application (project stopped here)
  3. ConsentedNov 2008 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Revised.

Official register: July 2026

Recorded status: Revised. Source record updated 2012-08-15.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

1.200 MW
Registered Capacity

πŸ“‹ Project Overview

Invervar Hydro is a 1.2 MW conventional hydro project in Scotland. The applicant or operator on record is Green Highland Renewables. The scheme is currently in the planning system, submitted August 2007. The determining authority is Perth and Kinross, reference 07/00004/HYDRO.

Site Schematic

UPPER RES. LOWER RES. PENSTOCK TAILRACE GEN. GRID HEAD: ?m Β· POWER: 1.200 MW Β· ? turbines

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)1.200 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperGreen Highland Renewables
Owner / operatorGreen Highland Renewables
Year consented2008
LocationInvervar, Glen Lyon Perth and Kinross, Tayside
RegionScotland
Coordinates56.6093039Β°N, 4.176618Β°W

Additional published register fields

Registered technologySmall Hydro
Are they re-applying (New REPD Ref)477

πŸ“… Project Timeline

2007-08-07
2008-11-25