πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Conventional Hydro

Duror 2 Hydro Scheme

Land 330M SE Of, Birch View, Auchindarroch Duror, Appin, Strathclyde, Highland, PA38 4BS

Duror 2 Hydro Scheme is a 0.4 MW conventional hydro project in Scotland. The applicant or operator on record is H2O Power Generation. It is recorded as under construction since July 2020. The determining authority is Highland, reference 18/05283/FUL.…

Under Construction
0 MW
Installed Capacity

πŸ“‹ Project Overview

Duror 2 Hydro Scheme is a 0.4 MW conventional hydro project in Scotland. The applicant or operator on record is H2O Power Generation. It is recorded as under construction since July 2020. The determining authority is Highland, reference 18/05283/FUL.

Site Schematic

UPPER RES. LOWER RES. PENSTOCK TAILRACE GEN. GRID HEAD: ?m Β· POWER: 0 MW Β· ? turbines

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperH2O Power Generation
Owner / operatorH2O Power Generation
Year consented2019
Construction started2020
LocationLand 330M SE Of, Birch View, Auchindarroch Duror, Appin, Strathclyde, Highland, PA38 4BS
RegionScotland
Coordinates56.6426802Β°N, 5.2540818Β°W

πŸ“… Project Timeline