Conventional Hydro

Dolymynach

Llanerchcawr, Claerwen Valley, Dolymynach Reservoir Dam Nr., Rhayader, Powys, Powys, LD6 5HF

Dolymynach is a 0.2 MW conventional hydro project in Wales. The applicant or operator on record is Dwr Cymru Welsh Water. Planning permission has been granted as of March 2019 and it is awaiting construction. The determining authority is Powys, reference 19/0112/FUL.…

Consented / Approved
0 MW
Installed Capacity

πŸ“‹ Project Overview

Dolymynach is a 0.2 MW conventional hydro project in Wales. The applicant or operator on record is Dwr Cymru Welsh Water. Planning permission has been granted as of March 2019 and it is awaiting construction. The determining authority is Powys, reference 19/0112/FUL.

Site Schematic

UPPER RES. LOWER RES. PENSTOCK TAILRACE GEN. GRID HEAD: ?m Β· POWER: 0 MW Β· ? turbines

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperDwr Cymru Welsh Water
Owner / operatorDwr Cymru Welsh Water
Year consented2019
LocationLlanerchcawr, Claerwen Valley, Dolymynach Reservoir Dam Nr., Rhayader, Powys, Powys, LD6 5HF
RegionWales
Coordinates52.2436905Β°N, 3.6031318Β°W