πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Conventional Hydro

Clunas Reservoir

Estate Office, Cawdor, Nairn, Highlands, Highland, IV12 5RE

Clunas Reservoir is a 0.3 MW conventional hydro project in Scotland. The applicant or operator on record is Cawdor SDT. The application has been withdrawn or the scheme abandoned. The determining authority is Highland, reference 18/05681/FUL.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningDec 2018 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Application Withdrawn.

Official register: July 2026

Recorded status: Planning Application Withdrawn. Source record updated 2019-09-27.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.300 MW
Registered Capacity

πŸ“‹ Project Overview

Clunas Reservoir is a 0.3 MW conventional hydro project in Scotland. The applicant or operator on record is Cawdor SDT. The application has been withdrawn or the scheme abandoned. The determining authority is Highland, reference 18/05681/FUL.

Site Schematic

UPPER RES. LOWER RES. PENSTOCK TAILRACE GEN. GRID HEAD: ?m Β· POWER: 0.300 MW Β· ? turbines

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.300 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperCawdor SDT
Owner / operatorCawdor SDT
LocationEstate Office, Cawdor, Nairn, Highlands, Highland, IV12 5RE
RegionScotland
Coordinates57.5270783Β°N, 3.9266437Β°W

Additional published register fields

Registered technologySmall Hydro

πŸ“… Project Timeline

2018-12-19