Conventional Hydro

Castleford Weir

Castleford Weir, Castleford, West Yorkshire, West Yorkshire, WF10

Castleford Weir is a 0.5 MW conventional hydro project in Yorkshire and Humber. The applicant or operator on record is Hallidays Hydropower. The application has been withdrawn or the scheme abandoned. The determining authority is Wakefield, reference 18/02889/FUL.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningJan 2019 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Application Withdrawn.

Official register: July 2026

Recorded status: Planning Application Withdrawn. Source record updated 2019-03-25.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.500 MW
Registered Capacity

πŸ“‹ Project Overview

Castleford Weir is a 0.5 MW conventional hydro project in Yorkshire and Humber. The applicant or operator on record is Hallidays Hydropower. The application has been withdrawn or the scheme abandoned. The determining authority is Wakefield, reference 18/02889/FUL.

Site Schematic

UPPER RES. LOWER RES. PENSTOCK TAILRACE GEN. GRID HEAD: ?m Β· POWER: 0.500 MW Β· ? turbines

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.500 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperHallidays Hydropower
Owner / operatorHallidays Hydropower
LocationCastleford Weir, Castleford, West Yorkshire, West Yorkshire, WF10
RegionYorkshire and Humber
Coordinates53.7286859Β°N, 1.3528541Β°W

Additional published register fields

Registered technologySmall Hydro

πŸ“… Project Timeline

2019-01-21