πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Conventional Hydro

Bruar Hydro Scheme

Pitagowan, Blair Atholl, Pitlochry, Tayside, Tayside, PH18 5TW

Bruar Hydro Scheme is a 1.9 MW conventional hydro project in Scotland. The applicant or operator on record is Bruar Hydro / Gilkes. It is recorded as operational since December 2015. The determining authority is Perth and Kinross, reference 12/00009/FLL.…

Operational Β· Since 2015
2 MW
Installed Capacity
2015
Commissioned

πŸ“‹ Project Overview

Bruar Hydro Scheme is a 1.9 MW conventional hydro project in Scotland. The applicant or operator on record is Bruar Hydro / Gilkes. It is recorded as operational since December 2015. The determining authority is Perth and Kinross, reference 12/00009/FLL.

Site Schematic

UPPER RES. LOWER RES. PENSTOCK TAILRACE GEN. GRID HEAD: ?m Β· POWER: 2 MW Β· ? turbines

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)2 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperBruar Hydro / Gilkes
Owner / operatorBruar Hydro / Gilkes
Year consented2012
Construction started2014
Commissioned / target2015
LocationPitagowan, Blair Atholl, Pitlochry, Tayside, Tayside, PH18 5TW
RegionScotland
Coordinates56.8314773Β°N, 3.9298593Β°W

πŸ“… Project Timeline