Conventional Hydro

Blackbarn Farm

Site To South East Of, Blackbarn Farm, Kilbirnie, Strathclyde, Ayrshire, KA25 7JZ

Blackbarn Farm is a 1 MW conventional hydro project in Scotland. The applicant or operator on record is ATTIX CIC. The planning permission has expired. The determining authority is North Ayrshire, reference 19/00059/PP.…

Expired
Project stageConsent lapsed
  1. PlanningJan 2019 (completed)
  2. Consented (completed)
  3. Consent lapsed (project stopped here)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Expired.

Official register: July 2026

Recorded status: Planning Permission Expired. Source record updated 2019-02-27.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

1.000 MW
Registered Capacity

πŸ“‹ Project Overview

Blackbarn Farm is a 1 MW conventional hydro project in Scotland. The applicant or operator on record is ATTIX CIC. The planning permission has expired. The determining authority is North Ayrshire, reference 19/00059/PP.

Site Schematic

UPPER RES. LOWER RES. PENSTOCK TAILRACE GEN. GRID HEAD: ?m Β· POWER: 1.000 MW Β· ? turbines

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)1.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperATTIX CIC
Owner / operatorATTIX CIC
LocationSite To South East Of, Blackbarn Farm, Kilbirnie, Strathclyde, Ayrshire, KA25 7JZ
RegionScotland
Coordinates55.77591Β°N, 4.6872768Β°W

Additional published register fields

Registered technologySmall Hydro

πŸ“… Project Timeline

2019-01-30