Southeast Of Ancroft Northmoor And Southwest Of Allerdean Grange Berwick-upon-Tweed Northumberland, Northumberland
Ancroft Northmoor Wind Farm is a 16 MW onshore wind project in North East. The applicant or operator on record is E.ON UK. The application has been withdrawn or the scheme abandoned. The determining authority is Northumberland, reference C/09/00063/CCMEIA.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningNov 2011 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2011-04-06.
Registered planning capacity; not measured generation.
Ancroft Northmoor Wind Farm is a 16 MW onshore wind project in North East. The applicant or operator on record is E.ON UK. The application has been withdrawn or the scheme abandoned. The determining authority is Northumberland, reference C/09/00063/CCMEIA.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
16.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
E.ON UK
Owner / operator
E.ON UK
Location
Southeast Of Ancroft Northmoor And Southwest Of Allerdean Grange Berwick-upon-Tweed Northumberland, Northumberland