Television Transmitter Centre, Ambleston, Haverfordwest, Dyfed, SA61, Dyfed
AMBLESTON SOLAR PANELS is a 6 MW solar farm project in Wales. The applicant or operator on record is Arqiva Ltd. It is recorded as operational since January 2012. The determining authority is Pembrokeshire, reference 11/0104/PA.β¦
OperationalΒ· Since 2012
Project stageOperating
PlanningJun 2011 (completed)
ConsentedAug 2011 (completed)
ConstructionOct 2011 (completed)
OperatingJan 2012 (current stage)
Closed (not yet reached)
Status in the official register: Operational.
Official register: July 2026
Recorded status: Operational. Source record updated 2014-01-29.
Registered planning capacity; not measured generation.
AMBLESTON SOLAR PANELS is a 6 MW solar farm project in Wales. The applicant or operator on record is Arqiva Ltd. It is recorded as operational since January 2012. The determining authority is Pembrokeshire, reference 11/0104/PA.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
6.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Arqiva Ltd
Owner / operator
Arqiva Ltd
Year consented
2011
Construction started
2011
Commissioned / target
2012
Location
Television Transmitter Centre, Ambleston, Haverfordwest, Dyfed, SA61, Dyfed