Allt Hallater, Glen Kinglass Loch. Etive Taynuilt Argyll, Strathclyde
Allt Hallater Hydro is a 2 MW conventional hydro project in Scotland. The applicant or operator on record is Npower Renewables. The planning application was refused. The determining authority is Argyll and Bute, reference 04/00219/ELSE36.β¦
Refused
Project stageRefused
PlanningJan 2004 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2012-12-07.
Registered planning capacity; not measured generation.
Allt Hallater Hydro is a 2 MW conventional hydro project in Scotland. The applicant or operator on record is Npower Renewables. The planning application was refused. The determining authority is Argyll and Bute, reference 04/00219/ELSE36.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
2.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Npower Renewables
Owner / operator
Npower Renewables
Location
Allt Hallater, Glen Kinglass Loch. Etive Taynuilt Argyll, Strathclyde