Conventional Hydro

Allt Choire a Bhalachain Hydro

Glen Garry, Highland

Allt Choire a Bhalachain Hydro is a 1.3 MW conventional hydro project in Scotland. The applicant or operator on record is Green Highland Renewables. The application has been withdrawn or the scheme abandoned. The determining authority is Highland.…

Withdrawn
Project stageWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Application Withdrawn.

Official register: July 2026

Recorded status: Planning Application Withdrawn. Source record updated 2012-05-11.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

1.300 MW
Registered Capacity

πŸ“‹ Project Overview

Allt Choire a Bhalachain Hydro is a 1.3 MW conventional hydro project in Scotland. The applicant or operator on record is Green Highland Renewables. The application has been withdrawn or the scheme abandoned. The determining authority is Highland.

Site Schematic

UPPER RES. LOWER RES. PENSTOCK TAILRACE GEN. GRID HEAD: ?m Β· POWER: 1.300 MW Β· ? turbines

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)1.300 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperGreen Highland Renewables
Owner / operatorGreen Highland Renewables
LocationGlen Garry, Highland
RegionScotland
Coordinates57.048315Β°N, 5.0926854Β°W

Additional published register fields

Registered technologySmall Hydro