Allt an Dubh Choirein

Dubh Choirein Hydro Scheme Comrie, Perth and Kinross

Allt an Dubh Choirein is a 1.6 MW conventional hydro project in Scotland. The applicant or operator on record is Drummond Estate. The application has been withdrawn or the scheme abandoned. The determining authority is Perth and Kinross, reference 14/02056/FLL.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningNov 2014 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Application Withdrawn.

Official register: July 2026

Recorded status: Planning Application Withdrawn. Source record updated 2019-04-01.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

1.600 MW
Registered Capacity

πŸ“‹ Project Overview

Allt an Dubh Choirein is a 1.6 MW conventional hydro project in Scotland. The applicant or operator on record is Drummond Estate. The application has been withdrawn or the scheme abandoned. The determining authority is Perth and Kinross, reference 14/02056/FLL.

Site Schematic

UPPER RES. LOWER RES. PENSTOCK TAILRACE GEN. GRID HEAD: ?m Β· POWER: 1.600 MW Β· ? turbines

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)1.600 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperDrummond Estate
Owner / operatorDrummond Estate
LocationDubh Choirein Hydro Scheme Comrie, Perth and Kinross
RegionScotland
Coordinates56.3117151Β°N, 4.1117484Β°W

Additional published register fields

Registered technologySmall Hydro

πŸ“… Project Timeline

2014-11-26