Allt a Chraois Hydroelectric Scheme is a 2 MW conventional hydro project in Scotland. The applicant or operator on record is Hydroplan. The application has been withdrawn or the scheme abandoned. The determining authority is Highland, reference 13/02382/FUL.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningJul 2013 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedSep 2015 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2019-05-30.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

2.000 MW
Registered Capacity

πŸ“‹ Project Overview

Allt a Chraois Hydroelectric Scheme is a 2 MW conventional hydro project in Scotland. The applicant or operator on record is Hydroplan. The application has been withdrawn or the scheme abandoned. The determining authority is Highland, reference 13/02382/FUL.

Site Schematic

UPPER RES. LOWER RES. PENSTOCK TAILRACE GEN. GRID HEAD: ?m Β· POWER: 2.000 MW Β· ? turbines

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)2.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperHydroplan
Owner / operatorHydroplan
Year consented2015
LocationLand 1600M SE Of Gobernuisgach Lodge Gobernuisgach Altnaharra, Highland
RegionScotland
Coordinates58.0707886Β°N, 4.4559997Β°W

Additional published register fields

Registered technologySmall Hydro

πŸ“… Project Timeline

2013-07-09
2015-09-03