Alfreton Solar Farm is a 25 MW solar farm project in East Midlands. The applicant or operator on record is Kronos Solar. The application has been withdrawn or the scheme abandoned. The determining authority is North East Derbyshire, reference 20/01282/FL.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningDec 2020 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2021-01-31.
Registered planning capacity; not measured generation.
Alfreton Solar Farm is a 25 MW solar farm project in East Midlands. The applicant or operator on record is Kronos Solar. The application has been withdrawn or the scheme abandoned. The determining authority is North East Derbyshire, reference 20/01282/FL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.