Airfield Farm, adjacent to Santa Pod raceway, Podington, Wellingborough, Bedfordshire, NN29 7XA
Airfield Farm (Podington) is a 8.6 MW onshore wind project in Eastern. The applicant or operator on record is Airvolution Energy. It is recorded as operational since February 2017. The determining authority is Bedford, reference 08/02692/MAF.β¦
OperationalΒ· Since 2017
Official register: July 2026
Recorded status: Operational. Source record updated 2017-04-19.
Registered planning capacity; not measured generation.
Airfield Farm (Podington) is a 8.6 MW onshore wind project in Eastern. The applicant or operator on record is Airvolution Energy. It is recorded as operational since February 2017. The determining authority is Bedford, reference 08/02692/MAF.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
8.600 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Airvolution Energy
Owner / operator
Airvolution Energy
Year consented
2012
Construction started
2016
Commissioned / target
2017
Location
Airfield Farm, adjacent to Santa Pod raceway, Podington, Wellingborough, Bedfordshire, NN29 7XA