Onshore Wind

Airfield Farm (Podington)

Airfield Farm, adjacent to Santa Pod raceway, Podington,, Bedfordshire, NN29 7XA

Airfield Farm (Podington) is a 20.7 MW onshore wind project in Eastern. The applicant or operator on record is Nuon Renewables. The scheme is currently in the planning system, submitted October 2005. The determining authority is Bedford, reference 05/02589/FUL.…

Revised
Project stageSuperseded by a new application
  1. PlanningOct 2005 (completed)
  2. Superseded by a new application (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Revised.

Official register: July 2026

Recorded status: Revised. Source record updated 2011-12-02.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

20.700 MW
Registered Capacity

πŸ“‹ Project Overview

Airfield Farm (Podington) is a 20.7 MW onshore wind project in Eastern. The applicant or operator on record is Nuon Renewables. The scheme is currently in the planning system, submitted October 2005. The determining authority is Bedford, reference 05/02589/FUL.

Site Schematic

EASTERN Β· ? turbines Β· ? kmΒ²

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)20.700 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperNuon Renewables
Owner / operatorNuon Renewables
LocationAirfield Farm, adjacent to Santa Pod raceway, Podington,, Bedfordshire, NN29 7XA
RegionEastern
Coordinates52.234422Β°N, 0.6030063Β°W

Additional published register fields

Registered technologyWind Onshore
Turbine Capacity (MW)2
No. of Turbines9
Are they re-applying (New REPD Ref)4116

πŸ“… Project Timeline

2005-10-20