Nr Sneid, land south of M62, north of Aire & Calder navigation, nr Pollington, Humberside
Aire & Calder Wind Farm is a 45 MW onshore wind project in Yorkshire and Humber. The applicant or operator on record is E.ON UK. The application has been withdrawn or the scheme abandoned. The determining authority is East Riding of Yorkshire, reference 05/05933/STPLFE.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningAug 2005 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2011-06-29.
Registered planning capacity; not measured generation.
Aire & Calder Wind Farm is a 45 MW onshore wind project in Yorkshire and Humber. The applicant or operator on record is E.ON UK. The application has been withdrawn or the scheme abandoned. The determining authority is East Riding of Yorkshire, reference 05/05933/STPLFE.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
45.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
E.ON UK
Owner / operator
E.ON UK
Location
Nr Sneid, land south of M62, north of Aire & Calder navigation, nr Pollington, Humberside