πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Conventional Hydro

Abhainn Rath

Abhainn Rath, Loch Treig, Fort William,, Highland

Abhainn Rath is a 2 MW conventional hydro project in Scotland. The applicant or operator on record is Green Highland. The application has been withdrawn or the scheme abandoned. The determining authority is Highland, reference 14/03187/FUL.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningAug 2014 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Application Withdrawn.

Official register: July 2026

Recorded status: Planning Application Withdrawn. Source record updated 2014-12-05.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

2.000 MW
Registered Capacity

πŸ“‹ Project Overview

Abhainn Rath is a 2 MW conventional hydro project in Scotland. The applicant or operator on record is Green Highland. The application has been withdrawn or the scheme abandoned. The determining authority is Highland, reference 14/03187/FUL.

Site Schematic

UPPER RES. LOWER RES. PENSTOCK TAILRACE GEN. GRID HEAD: ?m Β· POWER: 2.000 MW Β· ? turbines

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)2.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperGreen Highland
Owner / operatorGreen Highland
LocationAbhainn Rath, Loch Treig, Fort William,, Highland
RegionScotland
Coordinates56.7734096Β°N, 4.8057857Β°W

Additional published register fields

Registered technologySmall Hydro

πŸ“… Project Timeline

2014-08-28