π Project Overview
Tullymurdoch Wind Farm is a 14.4 MW onshore wind project in Scotland. The applicant or operator on record is Temporis Capital. It is recorded as operational since January 2018. The determining authority is Perth and Kinross, reference 12/01423/FLL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 14 MW |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Temporis Capital |
| Owner / operator | Temporis Capital |
| Year consented | 2014 |
| Construction started | 2017 |
| Commissioned / target | 2018 |
| Location | Alyth, Blairgowrie, Tayside, Tayside, PH10 |
| Region | Scotland |
| Coordinates | 56.6549085Β°N, 3.3134139Β°W |