πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Conventional Hydro

River E Hydro Scheme

River E Loch Mhor Loch Ness, Highland

River E Hydro Scheme is a 3 MW conventional hydro project in Scotland. The applicant or operator on record is RWE npower. It is recorded as operational since November 2007. The determining authority is Highland, reference IN2003978.…

Operational Β· Since 2007
3 MW
Installed Capacity
2007
Commissioned

πŸ“‹ Project Overview

River E Hydro Scheme is a 3 MW conventional hydro project in Scotland. The applicant or operator on record is RWE npower. It is recorded as operational since November 2007. The determining authority is Highland, reference IN2003978.

Site Schematic

UPPER RES. LOWER RES. PENSTOCK TAILRACE GEN. GRID HEAD: ?m Β· POWER: 3 MW Β· ? turbines

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)3 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperRWE npower
Owner / operatorRWE npower
Year consented2005
Commissioned / target2007
LocationRiver E Loch Mhor Loch Ness, Highland
RegionScotland
Coordinates57.2135033Β°N, 4.4505678Β°W

πŸ“… Project Timeline