π Project Overview
Newlands Farm Solar is a 20.5 MW solar farm project in South East. The applicant or operator on record is Sunsave 10 (FAREHAM) / Vogt Solar. It is recorded as operational since March 2014. The determining authority is Fareham, reference P/13/0528/FP.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 21 MW |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Sunsave 10 (FAREHAM) / Vogt Solar |
| Owner / operator | Sunsave 10 (FAREHAM) / Vogt Solar |
| Year consented | 2013 |
| Commissioned / target | 2014 |
| Location | between Fareham and Stubbington, Portsmouth, Hampshire, PO14 1AU |
| Region | South East |
| Coordinates | 50.8313248Β°N, 1.1961179Β°W |