πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Conventional Hydro

Mullardoch Tunnel

Highland, Highland

Mullardoch Tunnel is a 2.4 MW conventional hydro project in Scotland. The applicant or operator on record is Scottish and Southern Energy (SSE). It is recorded as operational since January 1955. The determining authority is Highland.…

Operational Β· Since 1955
2 MW
Installed Capacity
1955
Commissioned

πŸ“‹ Project Overview

Mullardoch Tunnel is a 2.4 MW conventional hydro project in Scotland. The applicant or operator on record is Scottish and Southern Energy (SSE). It is recorded as operational since January 1955. The determining authority is Highland.

Site Schematic

UPPER RES. LOWER RES. PENSTOCK TAILRACE GEN. GRID HEAD: ?m Β· POWER: 2 MW Β· ? turbines

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)2 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperScottish and Southern Energy (SSE)
Owner / operatorScottish and Southern Energy (SSE)
Commissioned / target1955
LocationHighland, Highland
RegionScotland
Coordinates57.3387272Β°N, 4.9448739Β°W

πŸ“… Project Timeline