πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Conventional Hydro

Grudie

S/O Bridge Of Grudie, Loch Maree, Anchnasheen,, Highland, IV22 2HL

Grudie is a 2 MW conventional hydro project in Scotland. The applicant or operator on record is RWE Npower Renewables. It is recorded as operational since September 2017. The determining authority is Highland, reference 13/02171/FUL.…

Operational Β· Since 2017
2 MW
Installed Capacity
2017
Commissioned

πŸ“‹ Project Overview

Grudie is a 2 MW conventional hydro project in Scotland. The applicant or operator on record is RWE Npower Renewables. It is recorded as operational since September 2017. The determining authority is Highland, reference 13/02171/FUL.

Site Schematic

UPPER RES. LOWER RES. PENSTOCK TAILRACE GEN. GRID HEAD: ?m Β· POWER: 2 MW Β· ? turbines

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)2 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperRWE Npower Renewables
Owner / operatorRWE Npower Renewables
Year consented2014
Construction started2016
Commissioned / target2017
LocationS/O Bridge Of Grudie, Loch Maree, Anchnasheen,, Highland, IV22 2HL
RegionScotland
Coordinates57.6498999Β°N, 5.4126762Β°W

πŸ“… Project Timeline