π Project Overview
Beinn an Tuirc Phase 2 is a 43.7 MW onshore wind project in Scotland. The applicant or operator on record is Scottish Power Renewables. It is recorded as operational since September 2014. The determining authority is Argyll and Bute, reference 05/01397/DET.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 44 MW |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Scottish Power Renewables |
| Owner / operator | Scottish Power Renewables |
| Year consented | 2007 |
| Construction started | 2010 |
| Commissioned / target | 2014 |
| Location | South of original Beinn and Tuirc Nr. Carradale, Strathclyde |
| Region | Scotland |
| Coordinates | 55.5731706Β°N, 5.5873527Β°W |