Solar Farm

Arna Wood Solar

Arna Wood Farm, East Arna Wood Lane, Lancaster, Lancashire, Lancashire, LA2 0AE

Arna Wood Solar is a 6.2 MW solar farm project in North West. The applicant or operator on record is BE Renewables (on behalf of Arna Wood). It is recorded as operational since March 2017. The determining authority is Lancaster, reference 14/00907/FUL.…

Operational Β· Since 2017
6 MW
Installed Capacity
2017
Commissioned

πŸ“‹ Project Overview

Arna Wood Solar is a 6.2 MW solar farm project in North West. The applicant or operator on record is BE Renewables (on behalf of Arna Wood). It is recorded as operational since March 2017. The determining authority is Lancaster, reference 14/00907/FUL.

Site Schematic

SUBSTATION ? ha Β· 6.2 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)6 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperBE Renewables (on behalf of Arna Wood)
Owner / operatorBE Renewables (on behalf of Arna Wood)
Year consented2015
Construction started2017
Commissioned / target2017
LocationArna Wood Farm, East Arna Wood Lane, Lancaster, Lancashire, Lancashire, LA2 0AE
RegionNorth West
Coordinates54.0222627Β°N, 2.8228343Β°W

πŸ“… Project Timeline