π Project Overview
Antislip Antiwear Treads International, Swinbourne Drive - Solar Panels is a 0.15 MW solar farm project in Eastern. The applicant or operator on record is AATI Limited. Planning permission has been granted as of October 2023 and it is awaiting construction. The determining authority is Braintree, reference 23/01996/P14JPA.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 0 MW |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | AATI Limited |
| Owner / operator | AATI Limited |
| Year consented | 2023 |
| Location | Antislip Antiwear Treads International Ltd Globe Works 11 Swinbourne DriveΒ Braintree, Essex, CM7 2YP |
| Region | Eastern |
| Coordinates | 51.8820018Β°N, 0.5366603Β°E |